Hallway, stairs and landings repainted across three floors in Frinton-on-Sea
Walls, ceilings and all the woodwork repainted from the tiled hall to the loft, with cracked doors, chipped woodwork and damaged plaster repaired first.
The brief
The customer wanted the house redecorated from the front door to the loft: the hallway, both flights of stairs, the landings on every floor and the small loft room, with all the woodwork done as well. The kitchen and living room were part of the same job; they are not pictured here.
The challenge
- Original panelled doors with split and cracked panels, and chipped paint on doors, frames, skirtings, strings and newel posts.
- Peeling paint and plaster on the wall beside the front door. The cause was fixed and we made good the wall before decorating.
- Damaged plaster on the curved corner by the hall door.
- A lot of detailed woodwork: turned spindles, newel posts and drops, deep skirtings, dado rail, hall panelling and cornice.
- The customer had a fixed timescale, so we worked some evenings and weekends to fit around it.
What we did
Protection and preparation
- Dust sheets down throughout and the stair runner, carpets and tiled hall floor masked and protected.
- Filled and repaired the cracked door panels and the chips in doors, frames, skirtings and the staircase.
- Made good the plaster beside the front door and on the curved corner by the hall door.
Walls and ceilings
- Painted the ceilings in the hall, stairwells, landings and loft.
- Painted the walls from the hall to the loft in a warm stone colour, including the hall panelling below the dado rail.
Woodwork
- Painted all doors, frames and architraves, skirtings, dado rail and the window boards.
- Painted the full staircase: spindles, handrails, newel posts, drops and strings, on both flights.
The result
The tired white and off-white walls are now a single warm stone colour from the front door to the loft, so the house reads as one space. The woodwork is clean, bright white again, the cracked doors are filled and smooth, and the damaged plaster by the front door and on the curved corner has gone. The original tiled floor, cornice and turned staircase now stand out against the new colour.
Spec and timeline
- Paint: Dulux Trade Diamond.
- The customer bought the materials; we passed on our trade discounts and advised on what to buy.
- Duration: 6 days.
“Shayne took on a big decorating job for us, painting our kitchen, hallway, stairs, landings and living room across three floors, including all the woodwork. The house needed quite a bit of attention... There were a few bits of snagging along the way, which Shayne put right. He also worked late evenings and weekends to fit around our timescales, which was appreciated.”Jordan, Frinton-on-Sea
Photos
Drag the white button on each photo to see the before and after.


BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter

BeforeAfter
BeforeAfter
BeforeAfter
BeforeAfter