Aldgate kitchen refit: new layout, reworked doorways and a dark shaker kitchen
The customer wanted the old kitchen and granite worktops taken out, the hallway wall removed and the doorways reworked, then a new Benchmarx kitchen fitted to a new layout. Benchmarx drew up the kitchen plan and we fitted to it.
The Challenge
Under the old kitchen, part of the engineered oak floor was water damaged from a leak. We fixed the leak. The oak had to be lifted carefully so it could be relaid, then new joints cut so the patched-back boards would sit in with the existing floor.
The door changes meant blanking off the old hallway entrance and building a return nib wall, both in stud work and one-hour fire-rated plasterboard, plus a new fire-rated frame and door. We also worked around other trades, who handled the electrics, the gas disconnection, the grey kitchen floor and the glass splashback.
What we did
Strip-out
– Isolated the hot and cold feeds.
– Removed the old kitchen and granite worktops and took them away.
– Carefully lifted the engineered flooring in the hallway and the water-damaged area, ready to relay.
– Removed the old hallway wall and took it away.
Building work and first fix
– Cut a new door opening and fitted a fire-rated frame and door, finished in trims.
– Blanked off the old hallway entrance in stud work and fire-rated plasterboard.
– Built a return nib wall at the old double-door entrance in stud work and one-hour fire-rated plasterboard.
– Took out the old double cupboard doors and built a new wall with a frame and door, finished in trims.
Plastering and decorating
– Skimmed all the new walls in 3mm Thistle plaster.
– Feather-finished the ceiling where the light positions changed.
– Decorated the new walls and plastered areas in white.
Kitchen fitting
– Fitted the Benchmarx kitchen to the Benchmarx plan, including the tall housing unit and wall units.
– Fitted the white worktop and upstand, and the under-cabinet lighting.
– Made the final plumbing connections, and resited and plumbed in the washing machine.
Finishing
– Engineered new joints on the existing oak flooring and patched it back to sit in with the rest.
– Cleared all waste from site.
The result:
The old wood-effect kitchen with granite tops and a gas hob has gone. In its place is a larger L-shaped kitchen in dark shaker units, with a full run of wall units, a tall housing unit, white worktops and upstands, and LED strip lighting under the wall units. It has an electric hob with a black glass splashback, a built-in oven and an under-counter wine cooler. The walls are skimmed and painted white, the doorways have been reworked, and the oak floor in the living area has been patched back where the water damage was.
Premium Design Features
Every detail executed to perfection
Herringbone Tiling Mastery
Full wall-to-ceiling white herringbone pattern requiring precise measurement and expert installation. This level of tiling complexity separates premium bathrooms from standard renovations.Technical challenge: Perfect alignment across multiple surfaces including recessed niches
Terrazzo Renaissance
Premium pink/rose terrazzo flooring with integrated shower tray details. This on-trend, timeless material requires specialist installation and finishing.Luxury detail: Terrazzo integrated into recessed shelving niches for design continuity
Freestanding Centerpiece
Luxury freestanding bath positioned as the room’s focal point, requiring precise plumbing alignment and structural support for the weight.Engineering: Floor reinforcement and hidden plumbing connections
Walk-in Shower Excellence
Frameless glass walk-in shower with integrated recessed storage niches and chrome fixtures. Complete waterproofing system prevents any moisture issues.Technical precision: Glass panel perfect alignment with herringbone pattern
Specification & Timeline
We delivered precision across all trades
Project Timeline
Duration:
9 working days
Units:
Benchmarx, dark shaker-style doors with bar handles; kitchen plan by Benchmarx
Worktops:
White worktop with matching upstand
Splashback:
Stainless steel one-and-a-half bowl undermounted sink, swan-neck mixer tap
Appliances:
Electric hob, built-in oven, chimney extractor hood, under-counter wine cooler
Lighting:
LED strip under the wall units
Walls and doors:
Stud work and one-hour fire-rated plasterboard, 3mm Thistle skim, white paint; fire-rated frame and door
Flooring:
Engineered oak lifted, re-jointed and patched back by us; grey kitchen floor by others
Materials:
The customer bought the materials; we passed on our trade discounts and advised on what to buy.
Before & After Result
Magazine-worthy transformation
Before 1
Before 2
After 1
After 2
After 3
After 4
After 5
After 6
Want a Kitchen Renovation Like This?
From complete kitchen renovations to bespoke upgrades, Paul’s expertise delivers beautiful, practical results that exceed expectations. Whether you need a full kitchen transformation, new units and worktops, or premium finishing, we have the capability and skilled tradespeople to bring your vision to life.
SDL PKB Kitchen Renovation Promise
Complete Kitchen Renovations • Bespoke Kitchens • Worktops & Units • Plumbing & Electrical • Tiling & Flooring • Premium Finishes • Personalised Project Management