Bloomsbury Bathroom

Dated Bathroom Refitted with Freestanding Bath and Shower

10 days

Completion Time

Premium

Specifications

5⭐

Client Rating

A leak, a strip-out and a new layout: bathroom refit in Bloomsbury

The bathroom in this seventh-floor flat had sprung a leak. The customer wanted the leak fixed and the whole room redone: out with the beige tiles, the bath with a screen and the basin on a wooden stand, and in with a new layout with a freestanding bath, a separate shower, a wall-hung vanity and WC, and plenty of built-in storage.

The Challenge

– There had been a leak. We fixed it, and repaired the concrete subfloor with screed before anything new went in.
– New positions for the bath, shower and WC meant reworking the plumbing to suit the new layout.
– Seventh-floor flat: all waste went down and out through a licensed waste carrier, with nothing left in the communal areas.
– The towel radiator runs off the building’s communal hot water and heating, so it had to be taken off and reconnected.

What we did

Strip-out
– Protected the flooring along the access route and checked the stopcock would isolate the bathroom.
– Removed all wall tiles, the plaster and plasterboard damaged by tile removal, and the floor tiles.
– Removed the bath, bath screen, shower valve and riser, basin, WC, mirror, towel radiator, accessories and the old boxing around the soil pipe.
– Made all electrical and plumbing connections safe and checked the remaining pipework for leaks and corrosion.
– Waste taken away by a licensed waste carrier.

First fix
– Fixed the leak and repaired the concrete subfloor with screed.
– Reworked the plumbing for the new bath, shower and WC positions, and fitted a new shower pump.
– Ran a water pressure and flow test to confirm the new taps and shower were suitable.
– Built new boxing-in for the pipework and the wall-hung WC, with a tall recessed shelving niche and a niche in the shower.
– Ran power for the lighting and the extractor fan. The fan was fitted into the existing air brick, with no new hole drilled.
– Plaster bond and skim where needed.

Tiling
– Tanked the walls in the wet areas to make a waterproof membrane before tiling.
– Tiled the walls full height and the floor in large-format white marble-effect tiles.
– Gold trims on tile edges and niches, with gold mosaic backs to both niches.

Fitting and finishing
– Fitted the shower tray and a gold-framed glass enclosure, a concealed shower valve, a rainfall head and a handset.
– Fitted the freestanding bath with a wall-mounted filler and handset.
– Fitted the wall-hung two-drawer vanity with its tap, the wall-hung WC with a gold flush plate, the gold towel radiator, the LED mirror cabinet, the downlights and the accessories.
– Painted the ceiling and the door and frame, siliconed, and tested everything.
– Final waste clearance by a licensed waste carrier.

The result:

The dark beige room with a bath and screen has gone. In its place is a bright bathroom with a freestanding bath and a separate shower, white marble-effect tiles from floor to ceiling, and gold fittings throughout. The WC and vanity are wall-hung, which leaves the floor clear, and the storage is built into the walls: a tall shelving niche beside the shower and a niche inside it.

Specification & Timeline

We delivered precision across all trades

Project Timeline

Duration:
10 working days

Walls and floor:
Large-format white marble-effect tiles, full height

Bath:
Freestanding, wall-mounted gold filler and handset

Shower:
Tray and gold-framed glass enclosure; concealed valve, rainfall head, handset; tiled niche with gold mosaic

Basin:
Wall-hung white gloss two-drawer vanity, gold tap

WC:
Wall-hung, concealed cistern, gold flush plate

Heating:
Gold towel radiator on the building’s communal system

Storage:
Tall recessed shelving niche with gold trim and mosaic back

Lighting:
Downlights and an LED mirror cabinet; extractor fan

Team:
Rob and the SDL PKB London team

Materials:
The customer bought the materials; we passed on our trade discounts and advised on what to buy.

Before & After Result

Magazine-worthy transformation

Before 1
Before 2
Before 3
Before 4
Before 5
After 1
After 2
After 3

Want a Luxury Bathroom Like This?

From structural disasters to luxury transformations, Paul's expertise delivers results that exceed expectations. Whether you need complete rebuilding or premium finishing, we have the capability and craftspeople to deliver perfection.

SDL PKB Luxury Bathroom Promise

Structural Capability β€’ Premium Finishes β€’ Master Craftspeople β€’ Rob’s Personal Management β€’ Years Guarantee